# Simulate the best production sequence with the shortest time

**URL:** https://discourse.nodered.org/t/simulate-the-best-production-sequence-with-the-shortest-time/83961
**Category:** General
**Created:** [22 December 2023 16:58 UTC](https://discourse.nodered.org/t/simulate-the-best-production-sequence-with-the-shortest-time/83961 "2023-12-22T16:58:37Z")
**Posts on this page:** 2
**Page:** 1

<div class="post-metadata">

### Author: ![Manu77](https://avatars.discourse-cdn.com/v4/letter/m/8baadc/32.png) [@Manu77](https://discourse.nodered.org/u/Manu77)
#### Post date: [22 December 2023 16:58 UTC](https://discourse.nodered.org/t/simulate-the-best-production-sequence-with-the-shortest-time/83961/1 "2023-12-22T16:58:37Z")

</div>

Hello, we would like to design equipment with a Robot that can perform several operations. we have several machines with different times, is there a node that allows various simulations to be carried out based on time , what is the sequence of machines that the robot should go to to reduce the time that the machines are waiting  
If you know of any node/program please tell me  
Thanks

---

<div class="post-metadata">

### Author: ![system](https://us1.discourse-cdn.com/flex026/uploads/nodered/original/1X/d073cd938eafa2e558d7c2cd59003b3ef4963033.png) [@system](https://discourse.nodered.org/u/system)
#### Post date: [20 February 2024 16:59 UTC](https://discourse.nodered.org/t/simulate-the-best-production-sequence-with-the-shortest-time/83961/2 "2024-02-20T16:59:26Z")

</div>

This topic was automatically closed 60 days after the last reply. New replies are no longer allowed.