Simulate the best production sequence with the shortest time

Hello, we would like to design equipment with a Robot that can perform several operations. we have several machines with different times, is there a node that allows various simulations to be carried out based on time , what is the sequence of machines that the robot should go to to reduce the time that the machines are waiting
If you know of any node/program please tell me
Thanks

This topic was automatically closed 60 days after the last reply. New replies are no longer allowed.