The Bypass for the Change node before the switch Wanst there bevor the switch node.
so the crossed line was the main "payload Pipeline"
Because i Change the Topic in the Change node i cannot use this way for my values as payload….
The Bypass for the Change node before the switch Wanst there bevor the switch node.
so the crossed line was the main "payload Pipeline"
Because i Change the Topic in the Change node i cannot use this way for my values as payload….